Received design of future 3rd floor renovation
Site walkthrough 3r fl Dec 8th with client, vendor, and IT groups
Third floor design review on Dec 8th.
Sent quote to client on Dec 18th for 3rd floor cabling quote
Preparing questions from IT groups for client since this is a remote site
Follow up with client on estimated construction start date